J102 Zero Emission

The ULSTEIN J102 Zero Emission design features a hydrogen hybrid power solution without sacrificing on the benefits of the standard J102 design. Using readily available and proven H2 technologies, this design allows installation contractors to operate their WTIV in zero emission mode for 75% of its operational time.

Principal dimensions

Length:
142 m
Beam:
87 m
VDL:
10,500 mT
Crane capacity:
2,500 mT
WTGs 8 MW:
8 units
WTGs 15 MW:
4 units
Accommodation:
120 POB
Deck area:
6,500 sqm

Note: Subject to selected variant configuration

Other

WTGs 12 MW:
5 units
WTGs 17 MW:
4 units
Main hook:
2,500 mT @ 37 m
Main hook:
1,250 mT @ 65 m
Main crane position:
Around stern leg on centreline
Large spud cans:
Reducing bearing pressure

Please contact us for more information

Ulstein Design & Solutions B.V.

Cornerstone Building (6th floor)
Rotterdam Airportplein 32
3045 AP Rotterdam
The Netherlands

Tel: +31 10 475 00 11

udsbv.info@ulstein.com

Edwin van Leeuwen Ulstein 19 comp bw
Edwin van Leeuwen

Managing director

Tel: +31 653144777

edwin.vanleeuwen@ulstein.com