Seaway Alfa Lift

A dynamically-positioned installation vessel for the offshore wind industry.

Vessel type

Heavy lift

Built by

China Merchants Heavy Industry (CMHI), China

Year

2023

Owned by

Seaway 7

Designed by

Ulstein Design & Solutions B.V.

Ordered by

OHT

IMO Number

9889980

Principal dimensions

Length:
216.3 m
Beam:
56 m
Speed (max):
13 kn
Accommodation:
100 POB
Free deck area:
8,310 sqm
(+forecastle):
1,800 sqm
Free deck length:
148.4 m

Note: Subject to selected variant configuration

Capacities

Propulsion thrusters:
3 x 5,500 kW
Retractable thruster:
1 x 3,000 kW
Tunnel thrusters (fwd):
3 x 3,000 kW
Liebherr main crane:
3,000 mt
Deck strength:
30 t/m²
Positioning system:
DP 2
Class:
DnV

The vessel has been constructed at CMHI Haimen shipyard (Yno CMHI-207).

The vessel’s crane has a maximum lifting capacity of 3,000 tonnes at 30 metres and 1,000 tonnes at 76 metres outreach.

Ship history

March 2019: Steel cutting

October 2019: Keel laying

January 2020: Nominee for the Offshore Renewables Award

February 2021: Launching at the CMHI yard

Please contact us for more information

Ulstein Design & Solutions B.V.

Cornerstone Building (6th floor)
Rotterdam Airportplein 32
3045 AP Rotterdam
The Netherlands

Tel: +31 10 475 00 11

udsbv.info@ulstein.com